modified because an automation discussion on MRH:https://model-railroad-hobbyist.com/node/42657
- Staging width increased to 8 inches
- staging simplified & increased to five tracks
- The length of the staging track was increased to maximize the number of trains in staging
- This moved additional staging turnouts into the corner T-track module areas.
- This has been rectified in the upper left corner
- The right corner is just a turn around tack on this build
- There is an issue in the plan on the upper left side where two tracks are very close. That will require more work.
- Track details have been modified to reduce the number of small sections.
- module outlines show how they are configured for initial build.
- support issues required the right turn around be moved to the south east corner